Advantages
Stable Production
Stable and Skilled Team
-
110 Full-time and 7*24 three-shift
-
Employees from local + downtown (daily shuttle bus)
-
Skilled and experienced workers (90% between 25-40 yrs. old)
-
20% more salary than local average
-
Strictly social insured obeying national laws and standards
National Environmental Protection and Safety Certifications
-
Passed all national environmental protection certifications
-
Strictly Obeying all national safety laws and regulations
-
Orders doubled during 2017 when the Chinese government takes 0 tolerance on environmental and safety issues
In-house Inspection, Machining, Polishing, and Surface Treatment
-
Major processes are finished in-house including pickling and passivating
-
Most machining especially complex machining is finished in-house
-
CNC machine tools, technical support and automation upgrading available from our subsidiary company


Exceptional Quality
All jobs must follow Standard Operating Procedures and all products will pass strict QC standards before delivery.


SOP Cards for Ceramic Shell Making

Visual Inspection (Final)
All metals will be tested before and after the casting process. Besides regular mechanical tests, metals will be analyzed by a spark emission spectrometer.
The spectrometer in our testing center is the Bruker Q8 Magellan with customized 36 channels which enables outstanding accuracy, flexibility, and reliability.
Samples will be stored for at least 18 months






Fast Delivery

Convenient Location and
Efficient traffic enables
Fast Delivery
94 miles Highway to
Jinan International Airport
134 miles Highway to
Port of Qingdao
97 miles Highspeed Railway to
Port of Rizhao

2.5-hr Drive to Port of Qingdao
(18,260m TEUs in 2017 #8 in the world)

3 stops to Port of Rizhao
(3,010m TEUs in 2016)
Trough Shanxi–Henan–Shandong Railway
(world's longest heavy freight railway )

1.5-hr Drive to
Jinan International Airport

Port of Vancouver
Port of Seattle
16 days
Port of Los Angeles
17 days
Port of Montreal
22 days
Port of New York
28 days
Port of Savannah
29 days
Port of Houston
24 days
Upgrade Capability
Our goal is providing customers products with the best quality, cost efficiency and delivery time. Therefore, we always choose the optimized manufacturing processes for our products. With support from our own machine tool department and the subsidiary company (EVER automation), we are able to upgrade our production lines to fully automatic if there are stable large quantity same parts order requests.